Wyniki wyszukiwania

Filtruj wyniki

  • Czasopisma
  • Date

Wyniki wyszukiwania

Wyników: 1
Wyników na stronie: 25 50 75
Sortuj wg:
Pobierz PDF Pobierz RIS Pobierz Bibtex

Abstrakt

This paper focused on a study concerned with the motion of platforms at loading stations during truck changing in Trucklift slope hoisting system built in Jaeryong open-pit iron mine, DPR of Korea. The motion of platform in Trucklift slope hoisting system produces undesirable effect on truck changing. To analyze the motion of platform during truck changing, we built the dynamic model in ADAMS environment and control system in MATLAB/Simulink. Simulation results indicate that the normal truck changing can be realized without arresters at loading stations by a reasonable structural design of platforms and loading stations.
Przejdź do artykułu

Bibliografia

[1] A.A. Kuleshov, RU Patent, 2168630 C1, filed June 10 (2001).
[2] W . Peter, WO, 2008/138055 A1, filed Nov. 20 (2008).
[3] J.D. Tarasov, RU Patent, 2284958 C1, filed Oct. 10 (2006).
[4] http://www.siemagtecberg.com/infocentre/technical-information/ti_27-trucklift.html, accessed: 05.02.2017
[5] M. Schmid, Tire modeling for multibody dynamics applications. Technical Report, sbel.wisc.edu, University of Wisconsin‐Madison, 5-14 (2011)
[6] X.B. Ning, C.L. Zhao, J.H. Shen, Procedia Engineering 16, 333-341 (2011).
[7] X.Q. Zhang, B. Yang, C. Yang, G.N. Xu, Procedia Engineering 37, 120-124 (2012).
[8] P.G. Adamczyk, D. Gorsich, G. Hudas, J. Overholt, Proceedings of SPIE 5083, 63-74 (2003).
Przejdź do artykułu

Autorzy i Afiliacje

Tok Hyong Han
1
ORCID: ORCID
Kwang Hyok Kim
1
ORCID: ORCID
Un Chol Han
2
ORCID: ORCID
Kwang Myong Li
2
ORCID: ORCID

  1. Kim Chaek University of Technology, Faculty of Mining Engineering, Pyongyang, Democratic People’s Republic of Korea
  2. Kim Chaek University of Technology, School of Science and Engineering, Pyongyang, Democratic People’s Republic of Korea

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji