The paper describes practical results of four-year laboratory studies completed to estimate technically feasible conditions of upgrading an existing sludge disposal system. A minimization of sludge mass and volume together with an energy recovery improvement were main goals of these activities. The way from lab studies and simulations to full scale investments has been shown with a special emphasis on application of respirometric procedure being applied by authors. Proposed was authors’ procedure for an estimation of a digestion time prediction for sludge of specific composition. Investigations completed at existing wastewater treatment plant resulted in practical implementation to be used during the design of upgrading and extension of the digestion and energy recovery system at the plant. It was proved that proposed changes provide close to optimum conditions for process performance and the application of proposed calculation procedures was adopted by design team
The article describes problems related to intensification of energy production at a sewage treatment plant. The authors analyze anaerobic co-digestion of sludge from a water treatment plant and sewage treatment plant. The authors proposed a methodology of the research and analyzed the preliminary results, which showed that co-digestion of sewage and water sludge enhanced biogas production. The authors hope that the results of the study will provide a basis for development of methodology for sludge control and disposal.