Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 3
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

In order to meet the lightweight requirements of high-speed trains, the inductancecapacitance (LC) resonance circuits are cancelled in the traction drive system of some high-speed electric multiple units (EMUs) in China, which will lead to large low-order current harmonics on the grid side in the traction drive system of EMUs, seriously affecting the power quality. Therefore, the low-order harmonic current of the traction drive system of an EMU is studied in this paper. Firstly, the working principle of a four-quadrant pulse rectifier in a traction drive system is analyzed, and then the generation mechanism of loworder current harmonics on the grid side is studied deeply. Secondly, the voltage outer loop and current inner loop control of a four-quadrant pulse rectifier are optimized respectively. In the voltage outer loop control, a Butterworth filter is designed to suppress the beat frequency voltage of the DC side voltage, so as to indirectly suppress the low-order current harmonics. In the current inner loop, a quasi-proportional resonance (PR) controller with harmonic compensation is used to suppress low-order current harmonics, and a novel loworder current harmonics suppression strategy based on the Butterworth filter and quasi-PR controller is proposed. Finally, the results of the simulated validation of the proposed control strategy show that compared with the existing method of the notch filter ¸ PR controller, the proposed optimal control strategy has a better effect on low-order current harmonic suppression, and improves the dynamic performance of the control system, further showing the correctness and effectiveness of the optimal control strategy.
Go to article

Authors and Affiliations

Feng Zhao
1
Jianing Zhang
1
ORCID: ORCID
Xiaoqiang Chen
1 2
Ying Wang
1 2
ORCID: ORCID

  1. School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou, China
  2. Key Laboratory of Opto-Technology and Intelligent Control Ministry of Education, Lanzhou, China
Download PDF Download RIS Download Bibtex

Abstract

Aiming to address power consumption issues of various equipment in metro stations and the inefficiency of peak shaving and valley filling in the power supply system, this study presents an economic optimization scheduling method for the multi-modal “source-network-load-storage” system in metro stations. The proposed method, called the Improved Gray Wolf Optimization Algorithm (IGWO), utilizes objective evaluation criteria to achieve economic optimization. First, construct a mathematical model of the “sourcenetwork- load-storage” joint system with the metro station at its core. This model should consider the electricity consumption within the station. Secondly, a two-layer optimal scheduling model is established, with the upper model aiming to optimize peak elimination and valley filling, and the lower model aiming to minimize electricity consumption costs within a scheduling cycle. Finally, this paper introduces the IGWO optimization approach, which utilizes meta-models and the Improved Gray Wolf Optimization Algorithm to address the nonlinearity and computational complexity of the two-layer model. The analysis shows that the proposed model and algorithm can improve the solution speed and minimize the cost of electricity used by about 5.5% to 8.7% on the one hand, and on the other hand, it improves the solution accuracy, and at the same time effectively realizes the peak shaving and valley filling, which provides a proof of the effectiveness and feasibility of the new method.
Go to article

Authors and Affiliations

Jingjing Tian
1
Yu Qian
1
Feng Zhao
1 2
Shenglin Mo
1
Huaxuan Xiao
1
Xiaotong Zhu
1
Guangdi Liu
1

  1. School of Automation and Electrical Engineering, Lanzhou Jiaotong University Lanzhou, China
  2. Key Laboratory of Opto-Technology and Intelligent Control Ministry of Education Lanzhou, China
Download PDF Download RIS Download Bibtex

Abstract

A three-level multi-input DC/DC converter is proposed to solve the problems of complex interface circuit structure and high economic cost for multi-source access to the joint power supply distribution system. In this structure, multiple dc sources are integrated into a three-level DC/DC converter. In comparison with the two-stage counterpart, two active switches and boost diodes are eliminated, while two blocking diodes are added to block the reverse current from the dc-link capacitors. In addition, when the input inductors work in the discontinuous conduction mode, power sharing among different input sources can be achieved by properly selecting the inductance value. The working principle of the converter is analyzed by introducing nine working modes in detail and deriving the steady-state relationship expressions. The parameter range of the element is determined and the design process of a group of dynamic parameter values is shown. Finally, the power electronics real-time simulation platform is built based on StarSim HIL and the corresponding experimental waveforms are given to verify the topology and analysis.
Go to article

Authors and Affiliations

Jingjing Tian
1
Jiaoping Qu
1
ORCID: ORCID
Feng Zhao
1
Xiaoqiang Chen
1 2
Ying Wang
1 2
ORCID: ORCID
Yang Gan
1

  1. School of Automation & Electrical Engineering, Lanzhou Jiaotong University, Lanzhou, China
  2. Key Laboratory of Opto-technology and Intelligent Control, Lanzhou Jiaotong University, Ministry of Education, Lanzhou, China

This page uses 'cookies'. Learn more