Wyniki wyszukiwania

Filtruj wyniki

  • Czasopisma
  • Date

Wyniki wyszukiwania

Wyników: 1
Wyników na stronie: 25 50 75
Sortuj wg:

Abstrakt

The article presents the assumptions, characteristics and description of the implementation of a pilot system for on-line monitoring of partial discharges in heads of the high-voltage cable lines. The main purpose of the implementation was to increase the reliability of cable line heads by equipping them with a system of continuous assessment of technical condition with direct transmission of measurement data and alarms to the SCADA system. In order to achieve the assumed goal, unconventional methods for measuring partial discharges were used, the application of which does not require disconnecting the line from the voltage. The implementation was carried out on an active 110 kV high voltage cable line in the area of activity of one of the Distribution System Operators.

Przejdź do artykułu

Autorzy i Afiliacje

Michał Konarski
Paweł Węgierek
ORCID: ORCID

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji