The paper presents results of numerical calculations of a diaphragm wall model executed in Poznań clay formation. Two selected FEM codes were applied, Plaxis and Abaqus. Geological description of Poznań clay formation in Poland as well as geotechnical conditions on construction site in Warsaw city area were presented. The constitutive models of clay implemented both in Plaxis and Abaqus were discussed. The parameters of the Poznań clay constitutive models were assumed based on authors’ experimental tests. The results of numerical analysis were compared taking into account the measured values of horizontal displacements.
Plastic rocks can creep, therefore the knowledge of the rheological properties of the drilled formations is an important element of the drilling process and when choosing borehole designs. These properties of plastic formations also influence the way in which appropriate drilling technology and drilling mud properties are selected. The article presents the effect of basic rheological parameters of salt from the Fore-Sudetic Monocline deposit on the drilling of boreholes in the mining area of KGHM Polska Miedź, which in the future can be used as a good drilling practice to improve the safety and efficiency of drilling.
The process of drilling in plastic rocks may be hindered. Salt is a plastic rock and in the analyzed rock mass it is deposited at a considerable depth. The caprock exerts big loads on it, beside the temperature in the deposit intensifies the rheological properties of the rock. The creep process causes that the borehole contracts, therefore the knowledge about the rheological properties of the drilled rock is very important for establishing the safe time in which the well may remain uncased. The paper is devoted to the influence of basic rheological parameters of salt bed in the Fore-Sudetic Monocline on the process of drilling of a borehole in the area of KGHM Polska Miedź as these data can be used in drilling practice in the future.
The road tunnel in Laliki was excavated in highly heterogeneous, severely tectonically damaged and mainly very weak rocks of the Western Carpathians flysch. In particular, the conditions were characterized by a high percentage of very weak laminated shale and weathered rock mass, an unfavorable and very steep slope of the rock layers and unstable hydrological conditions with outflows of water in loosened tectonic zones. That structure and properties of the rock mass highly uncertain. This paper describes the influence of geological engineering and geotechnical conditions on the primary lining of a main road tunnel. The deformation of the primary lining was analyzed in terms of the percentage share of sandstones and shale, geomechanical classifications RMR (Bieniawski 1989) and QTS (Tesar 1979), types of the primary lining and the use of rock bolts and micropiles. The analysis was preceded by characterization of geological engineering conditions and technological characterization of applied primary linings. Displacements of the primary lining, greater than acceptable, occurred several times in a top heading during tunneling. The primary lining was reinforced by additional rock bolts and wire mesh, a thicker layer of shotcrete and micropiles if deformation reached the emergency state for some types of linings and they didn't indicate any tendency for stabilization. The reinforcement was used until the deformation stabilization was achieved. In the most difficult conditions, the lining was reinforced by a longer micropile umbrella. Parameters for the primary lining were selected on the basis of ongoing geological engineering and geotechnical measurements, in accordance with NATM's principles. The rock mass around the tunnel in Laliki is an example of weak carrying capacity. The observed displacements in the rock mass indicate that the disturbed zone around the tunnel was heavily developed. The primary lining used in such conditions must bear a relatively high load capacity from overlying loosened material and therefore the lack of interaction with the surrounding rock mass should be assumed. The data obtained indicate that the use of the primary lining in the highly variable conditions in the Carpathian flysch requires accurate geological engineering and geotechnical analysis during the day-to-day process of tunneling in order to verify the projected assumptions. The primary linings should be reinforced as needed based on the results of geotechnical measurements, monitoring the interaction between the rock mass and the system of lining.
This article presents results of the numerical analysis of the interaction between heavy caterpillar tracks system and subsoil. The main goal of the article is to present an algorithm to design working platforms - temporary structures enabling the work of heavy construction equipment on weak subsoils. A semi-analytical method is based on the results of the numerical analysis performed with use of the finite element method (FE software ZSoil.PC [12]). The calculations were carried out for the piling rig machine - Bauer BH20H (BT60). Three ground models were adopted: Model 1: one layer - weak cohesive soil (clay); Model 2: two layers: weak cohesive soil (clay) and cohesionless working platform (medium sand); Model 3: one layer: strong cohesionless subsoil (medium sand). The following problems were solved: I) entry of the machine on the ground with various geotechnical parameters under each caterpillar tracks II) detection of the maximum permissible angle of ground slope.
The paper presents a new geotechnical solution indicating a possibility of effective building structures protection. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. To minimize the mining damage or to reduce its reach it is reasonable to look for technical solutions, which would enable effective protection of building structures. So far authors concentrated primarily on the development of building structure protection methods to minimize the damage caused by the underground mining. The application of geotechnical methods, which could protect building structures against the mining damage, was not considered so far in scientific papers. It should be noticed that relatively few publications are directly related to those issues and there are no practical examples of effective geotechnical protection. This paper presents a geotechnical solution indicating a possibility of effective protection of building structures. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. The calculations were carried out in the Abaqus software, based on the finite element method.