The utilization of mining waste is an important problem in Poland and Ukraine. The article presents one of the variants of waste mining in the quarry in Płaza. An analysis of the resource base of the deposit and their location at the area of Płaza deposit is carried out. The Płaza deposit is located in the western part of the Małopolskie province, in the entire Chrzanów commune. The Płaza deposit is constructed of Middle Triassic carbonates represented by the limestone-dolomite Olkusz Formation and the limestone-marlized Gogolin Formation. The deposit series lies on the dolomites of Röt age (Lower Triassic – Olenekian). The most valuable raw material was the pure limestone from the lower part of the Olkusz Formation, now almost completely exploited. The article presents the current state of mineable reserves of the deposit and their quality (chemical and physical characteristics). Moreover the article shows potential consumers of raw material and the possibility of extending the life of the mine work. According to the results of the environmental monitoring the ground and hydrogeological conditions were evaluated, the results of which allowed a more efficient use of the existing quarry area for mining waste disposal to be proposed. The paper presents a conceptual waste transport scheme, planned distribution and compaction of wastes belonging to the first, second and third group and then a surface reclamation. In view of the absence of similar decisions analogs, the consideration of the open-pit as a one solid geomechanical system functioning under the conditions of uncertainty is suggested. In order to examine the dynamics of the waste compaction process, some measures are foreseen to constantly observe their subsidence. The proposed measures for the synchronous disposal of mining waste in the worked-out area of the open-pit and the simultaneous mining operation in the quarry will allow the life cycle of the open-pit to be prolonged for 15–20 years.
The article concerns fly ashes generated from the combustion of hard coal and deposited on landfills. Investigation results describing fly ash taken from a combustion waste landfill are presented in the article. The investigation results indicate a possibility for combusting the coal reclaimed by separation from the fly ash and utilizing the remaining fly ash fractions.
Mechanical reclamation process of spent moulding sands generate large amounts dusts containing mainly rubbed spent binding agents and quartz dust. The amounts of post-reclamation dusts, depending of the reclamation system efficiency and reclaim dedusting system, can reach 5 -10% in relation to the total reclaimed moulding sand. This dust due to the high content of the organic substances is a threat to the environment and therefore requires the storage on landfills specially adapted for this type of waste. On the other hand, the presence of organic substances causes that these dusts have relatively high energy values that could be used. However, at present there is no coherent, environmentally friendly concept for the management of this type of dust. The paper presents the results of tests of thermal utilization the dusts (as a source of energy) were carried out at AGH University of Science and Technology. Thermal utilization of dusts was carried out in the co-burning with carbon carriers process or in individual burning (Patent PL 227878 B1 and patent application PL - 411 902).
This article intends to justify the gap in the research of similarity coefficient driven approaches
and cell formation problems (CFP) based on ratio data in cellular manufacturing systems
(CMS). The actual implication of ratio data was vaguely addressed in past literature, which
has been corrected recently. This research considered that newly projected CFP based on
ration data. This study further revealed the lack of interest of researchers in investigation for
an appropriate and improved similarity coefficient primarily for CFP based on ratio data.
For that matter a novel similarity coefficient named as Generalized Utilization-based Similarity
Coefficient (GUSC) is introduced, which scientifically handles ratio data. Thereafter
a two-stage cell formation technique is adopted. First, the proposed GUSC based method
is employed to obtained efficient machine cells. Second, a novel part allocating heuristic is
proposed to obtain effective part families. This proposed approach is successfully verified on
the test problems and compared with algorithms based on another similarity coefficient and
a recent metaheuristic. The proposed method is shown to obtain 66.67% improved solutions.
The article describes mine survey works during opening old St. Anthony of Padua water adit in Horní Město (Czech Republic) to make it accessible to visitors. The works cover the connecting survey and orientation measurement, traverse measurement of the first opened part, setting-out projection of the end of opened part to the surface to make shaft from the surface, new connecting survey and orientation measurement by shaft and traverse measurement of the rest of water adit. Non-standard aids and techniques were used during surveying. One of the tools is a suspended prism holder developed at Institute of geodesy and mine surveying, VSB – Technical university of Ostrava, registered as a utility patent.
The paper presents multi-criteria optimization method allowing for selection of the best production scenarios in underground coal mines. We discuss here the dilemma between strategies maximizing economic targets and rational resources depletion. Elaborated method combines different geological and mining parameters, structure of the deposit, mine’s infrastructure constrains with economic criteria such as the net present value (NP V), earnings before deducting interest and taxes (EBIT ) and the free cash flows to firm (FCFF). It refers to strategic production planning. Due to implementation of advanced IT software in underground coal mines (digital model, automated production scheduling) we were able to identify millions of scenarios finally reduced to a few – the best ones. The method was developed and tested using data from mine operation “X” (a real project – an example of a coking coal mine located in Poland). The reliability of the method was approved; we were able to identify multiple production scenarios better than the one chosen for implementation in the “X” mine. The final product of the method were rankings of scenarios grouped according to economic decision criteria. The best scenarios reached NP V nearly 50% higher than the Base Case, which held only 52. position out of 60. According to EBIT and FCFF criteria, 10 scenarios achieved results higher than the Base Case, but the percentage differences were very small, below 2 and 4%, respectively. The developed method is of practical importance and can be successfully applied to many other coal projects.