Details Details PDF BIBTEX RIS Title Application of Interval Arithmetic to Production Planning in a Foundry Journal title Archives of Foundry Engineering Yearbook 2017 Volume vol. 17 Issue No 1 Authors Duda, J. ; Stawowy, A. Keywords Application of IT to the foundry industry ; Production planning ; scheduling ; Uncertainty ; Interval arithmetic Divisions of PAS Nauki Techniczne Publisher The Katowice Branch of the Polish Academy of Sciences Date 2017 Type Artykuły / Articles Identifier DOI: 10.1515/afe-2017-0008 ; eISSN 2299-2944 Source Archives of Foundry Engineering; 2017; vol. 17; No 1 References Araujo (2008), de Lot sizing and furnace scheduling in small foundries Computers, Operations Research, 35, 916, doi.org/10.1016/j.cor.2006.05.010 ; Pereira (2016), The robust ( minmax regret ) single machine scheduling with interval processing times and total weighted completion time objective Computers, Operations Research, 66, 141, doi.org/10.1016/j.cor.2015.08.010 ; Stawowy (2013), Production scheduling for the furnace - casting line system of Foundry, Archives Engineering, 13, 84, doi.org/10.2478/afe-2013-006590 ; Han (2016), Evolutionary multi - objective blocking lot - streaming flow shop scheduling with interval processing time, Applied Soft Computing, 42, doi.org/10.1016/j.asoc.2016.01.033 ; Lei (2015), An effective neighborhood search for scheduling in dual - resource constrained interval job shop with environmental objective, International Journal of Production Economics, 159, doi.org/10.1016/j.ijpe.2014.07.026 ; Hickey (2001), Interval arithmetic : from principles to implementation of the, Journal ACM, 48, 1038, doi.org/10.1145/502102.502106 ; Stawowy (2012), Models and algorithms for production planning and scheduling in foundries - current state and development perspectives of Foundry, Archives Engineering, 12, 69, doi.org/10.2478/v10266-012-0039-4 ; Lei (2012), Interval job shop scheduling problems The, International Journal of Advanced Manufacturing Technology, 60, 291, doi.org/10.1007/s00170-011-3600-3 ; Duda (2015), Production scheduling under fuzziness for the furnace - casting line system of Foundry, Archives Engineering, 15, 29, doi.org/10.1515/afe-2015-0074